Fredericksburg District: Weekly Travel Alert for Sept. 6-12, 2026

I-95 Southbound

Exit 143 (Aquia/Garrisonville)

Tuesday – Thursday, 9 p.m.-4:30 a.m. Pavement markings near exit 143 (Aquia/Garrisonville) between mile markers 142-145 in Stafford County. Single lane closures begin 9 p.m. and double lane closures begin at 10 p.m. All southbound lanes reopen by 4:30 a.m. Wednesday-Friday mornings.

Exit 133 (Falmouth/Warrenton) to Exit 130 (Route 3)

Tuesday – Thursday, 9 p.m.-5 a.m. Alternating lane closures for bridge maintenance work over the Rappahannock River.

Caroline County

Route 1

Tuesday – Friday, 9 a.m.-3:30 p.m. Guardrail installation. Single lane closures at the Hanover County line and near S. River Road.

Route 1

Tuesday – Friday, 9 a.m.-3 p.m. Right lane closures on Route 1 between Ladysmith Road and Route 207 (Rogers Clark Boulevard). Utility work under permit.

Route 301

Tuesday – Friday, 9 a.m.-3:30 p.m. Guardrail installation at multiple locations. Single lane closures near Edmont Road and the Fort A.P. Hill gate.

Tuesday – Saturday, 7 p.m.-7 a.m. Mobile alternating lane closures for pavement marking between the Hanover County line and the intersection with Route 17 (Tidewater Trail).

Tuesday – Friday, 8 p.m.-6 a.m. Alternating lane closures for milling and paving on Route 301 between Moores Mill Road and the Mattaponi River bridge, and between Moores Mill Road and the Reedy Creek bridge.

Route 207 (Rogers Clark Boulevard)

Tuesday – Saturday, 7 p.m.- 7 a.m. Pavement marking. Alternating lane closures at multiple locations between the Bowling Green Bypass and I-95 at exit 104 (Carmel Church).

Route 639 (Ladysmith Road)

Tuesday – Friday, 9 a.m.-3 p.m. Single lane closure with one-way, alternating traffic directed by a flagging crew between Route 1 and Partlow Road. Fiber installation under permit.

Bridge Cleaning

Tuesday – Saturday, 7 p.m.-7 a.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:

Route 17 over Goldenvale Creek
Route 17 over Portobago Creek
Route 17 over Peumonsend Creek
Route 207 over Polecat Creek
Route 207 over Mattaponi River
Route 207 over I-95
Route 207 over Route 301
Route 301 over N. Fork Peumonsend Creek
Route 301 over Mattaponi River
Route 301 over Polecat Creek
Route 301 over Rappahannock River
Route 601 over I-95
Route 601 over North Anna River
Route 603 over Temples Mill
Route 605 over Mattaponi River
Route 605 over I-95
Route 626 over Mattaponi River
Route 632 over I-95
Route 639 over I-95
Route 647 over Mattaponi River
Route 652 over I-95
Route 654 over Mattaponi River
Route 722 over Mattaponi River

Gloucester County

Route 17

Tuesday – Thursday, 7 p.m.-5 a.m. Temporary paving marking, in connection with milling and paving. Alternating lane closures between Main Street and Farys Mill Road, between Farys Mill Road and Meredith Drive, and between Belroi Road and Fiddlers Green Road.

Secondary Road Resurfacing

Tuesday – Friday, 7 a.m.-7 p.m. Work will begin at noon Tuesday, and 7 a.m. on Wednesday-Friday mornings. Alternating lane closures on various secondary routes for road resurfacing. Flagging crew will direct traffic on the following routes:

Route 688 (Prospect Road)
Route 708 (Woodberry Road)
Route 731 (Wilson Circle)
Route 1125 (Oak Tree Drive)
Route 1126 (Valley Drive)
Route 1127 (Greenfield Drive)
Route 1128 (Harvest Circle)
Route 1129 (Hilltop Drive)
Route 1336 (Edwin Lane)
Route 1337 (Debbie Circle)

King George County

Route 3

Tuesday – Thursday, 8 p.m.-6 a.m. Milling and paving with alternating lane closures between Comorn Road and the Westmoreland County line.

Route 3 Westbound (Kings Highway)

Tuesday – Friday, 9 a.m.-3:30 p.m. Guardrail installation. Single lane closure.

Route 218 (Caledon Road)

Tuesday – Thursday, 9 p.m.- 5 a.m. Bridge repairs. Flagging crew will direct one-way, alternating traffic at the bridge over Machodoc Creek between Route 205 and Route 301.

Route 301

Tuesday – Friday, 9 a.m.-3:30 p.m. Guardrail installation. Single lane closures, multiple locations.

Route 603 (Fletchers Chapel Road)

Tuesday – Friday, 9 a.m.-3:30 p.m. Guardrail installation. Flagging crew will direct one-way, alternating traffic near County Drive.

King and Queen County

Secondary Road Resurfacing

Tuesday – Friday, 7 a.m.-7 p.m. Work will begin at noon Tuesday, and 7 a.m. on Wednesday-Friday mornings. Alternating lane closures on various secondary routes for road resurfacing. Flagging crew will direct traffic on the following routes:

Route 606 (Taylorsville Road)
Route 643 (Airport Road)
Route 680 (Hockley Lane)

King William County

Route 30

Tuesday – Friday, 9 a.m.-3:30 p.m. Single lane closure for guardrail installation near Route 607 (Beadles Road).

Route 360

Tuesday – Friday, 9 a.m.-3:30 p.m. Single lane closure for guardrail installation near Route 647 (Mill Road) and Route 1211 (Lancaster Road).

Wednesday – Friday, 9 a.m.-3 p.m. Alternating lane closure with flagging for soil boring work near Route 611 (Ventor Road).

Secondary Road Resurfacing

Tuesday – Friday, 7 a.m.-7 p.m. Alternating lane closures on various secondary routes for road resurfacing. Flagging crew will direct traffic on the following routes:

Route 634
Route 645 (Moorefield Road)
Route 1005 (Odi Street)

Lancaster County

Route 605 (Pinckardsville Road)

Wednesday – Friday, 9 a.m.-3:30 p.m. Soil samples. Alternating lane closures at the intersection with Carlson Road.

Route 695 (Windmill Point Road)

Tuesday – Saturday, 7 a.m.-7 p.m. One-way alternating traffic at the bridge over Oyster Creek. Construction to replace the bridge.

Lancaster County and Middlesex County

Route 3 over the Rappahannock River (Norris Bridge)

Wednesday – Friday, 7 p.m.- 6 a.m. (ending early Friday, Sept. 11). Maintenance work on the Route 3 bridge over the Rappahannock River with alternating one-way traffic through the work zone.

Mathews County

Route 14 (John Clayton Memorial Highway)

Monday – Friday, 9 a.m.-3:30 p.m. Single lane closure near Route 3 for guardrail installation.

Middlesex County

Route 17

Tuesday – Thursday, 9 a.m.-3:30 p.m. Single lane closure near Route 615 (Zion Branch Road) for guardrail installation.

Northumberland County

Route 605 (Pinckardsville Road)

Wednesday – Saturday, 7 a.m.-3 p.m. Soil samples. Alternating lane closures at the intersection with Carlson Road.

Richmond County

Route 3

Tuesday – Friday, 9 a.m.-3:30 p.m. Single lane closure for guardrail installation near Route 608 (Farnham Creek Road).

Route 360 at Newland Road

Tuesday – Thursday, 8 p.m.-6 a.m. Overnight crossover closure at the intersection of Route 360 and Newland Road. Construction activity for intersection improvement project. Travelers should use the next available crossover to U-turn and proceed toward their destination.

Route 619 (Mulberry Road/Rich Neck Road)

Wednesday – Thursday, 7 a.m.-7 p.m. Mobile lane closures for pavement marking.

Route 621 (Tallent Town Road)

Tuesday – Friday, 9 a.m.-3:30 p.m. Single lane closure for guardrail installation.

Bridge Cleaning

Tuesday – Saturday, 7 p.m.-6 a.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:

Route 697 over Little Totuskey Creek

Spotsylvania County

Route 1

Tuesday – Thursday, 8 p.m.-6 a.m. Milling, paving, and trench widening to create a slightly wider road shoulder. Alternating lane closures between South Roxbury Mill Road and the Ni River bridge.

Route 1 at Route 606 (Morris Road/Mudd Tavern Road)

Wednesday – Thursday, 8 p.m.-5 a.m. Alternating lane closures, with traffic direction from flagging crew. Utility work under permit.

Route 1 Northbound

Tuesday – Thursday, 8 p.m.-5 a.m. Alternating lane closures between Crossing Court and Market Street for construction of I-95 exit 126 area improvements.

Route 1 Northbound

Tuesday – Friday, 9 a.m.-3 p.m. Single lane closure on northbound Route 1 between Ondura Drive and Guinea Station Road for waterline work under permit.

Route 1 Southbound

Tuesday – Thursday, 8 p.m.-5 a.m. Alternating lane closures between Market Street and the I-95 southbound off-ramp at exit 126 (Spotsylvania) for construction of I-95 exit 126 area improvements.

Route 1 Southbound

Tuesday – Friday, 9 a.m.-3 p.m. Single lane closure on Route 1 southbound between Massaponax Church Road and Ladysmith Road in Caroline County for fiber installation under permit.

Route 17

Tuesday – Friday, 9 a.m.-3 p.m. Traffic shift and shoulder closures between Hospital Boulevard and Massaponax Church Road for road construction under permit.

Route 17

Tuesday – Friday, 9 a.m.-3:30 p.m. Flagging crew will alternate traffic for guardrail installation near Old Dominion Parkway.

Route 17

Tuesday – Thursday, 8 p.m.-6 a.m. Milling on Route 17 ahead of upcoming paving near the Route 1 intersection, and between the Massaponax Church Road and Jim Morris Road intersections.

Route 17

Tuesday – Thursday, 9 p.m.-5 a.m. Flagging crew will alternate traffic for guardrail installation near Route 608 (Massaponax Church Road).

Route 208 (Courthouse Road)

Tuesday – Saturday, 7 p.m.-7 a.m. Pavement marking between the I-95 overpasses and Smith Station Road. Alternating lane closures for mobile operation.

Route 208 Business

Tuesday – Saturday, 7 p.m.-7 a.m. Pavement marking between Courthouse Road and the Route 606 (Morris Road) intersection at Snell. Alternating lane closures for mobile operation.

Route 208 (Courthouse Road/Lake Anna Parkway)

Tuesday – Thursday, 8 p.m.-6 a.m. Pavement marking at multiple locations with alternating lane closures for mobile operation.

Route 605 (Mayre Road)

Wednesday – Friday, 9 a.m.-7 p.m. Paving. Flagging crew will direct alternating one-way traffic through the work zone between Route 738 (Partlow Road) and Route 1890 (Saddlebrooke Drive).

Route 608 (Massaponax Church Road)

Tuesday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic directed by a flagging crew between Flippo Drive and Summit Crossing Road. Road construction under permit.

Route 610 (Old Plank Road)

Tuesday – Friday, 9 a.m.-3 p.m. Alternating lane closures between Gordon Road and Ziyad Drive for construction.

Route 620 (Harrison Road)

Tuesday – Friday, 7 p.m.-5 a.m., and Tuesday – Friday, 9 a.m.-3 p.m. Alternating lane closures between Gordon Road and Old Plank Road for construction.

Route 627 (Gordon Road)

Tuesday – Friday, 7 p.m.-5 a.m., and Tuesday – Friday, 9 a.m.-3 p.m. Alternating lane closures between Legacy Woods and Old Plank Road for construction.

Route 2120 (Salem Fields Boulevard)

Wednesday – Friday, 9 a.m.-7 p.m. Milling, ahead of upcoming paving. Flagging crew will direct alternating one-way traffic through the work zone between Gordon Road and Rappahannock Drive.

Route 2121 (Rappahannock Drive)

Wednesday – Friday, 9 a.m.-7 p.m. Milling, ahead of upcoming paving. Flagging crew will direct alternating one-way traffic through the work zone between Smith Station Road and Gordon Road.

Bridge Cleaning

Tuesday – Saturday, 7 p.m.-7 a.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:

Route 1 over Matta River
Route 3 over I-95
Route 3 over Wilderness Run
Route 17 over Ruffins Pond
Route 208 over Po River
Route 208 over Lake Anna
Route 208 over I-95
Route 607 over I-95
Route 608 over Ni River
Route 608 over I-95
Route 612 over Lake Anna
Route 612 over Ni River
Route 620 over I-95
Route 628 over I-95
Route 646 over Matta River
Route 656 over Ta River
Route 719 over Lake Anna
Route 738 over Ta River
Route 2302 over stream

Stafford County

Route 1

Saturday, Sept. 12 – Sunday, Sept. 13, 9 a.m.-3 p.m. Route 1 will be reduced to a single northbound and southbound lane between Corporate Drive and Russell Road. Construction for bridge replacement at Chopawamsic Creek.

Route 1 Northbound

Tuesday – Thursday, 8 p.m.-6 a.m. Pavement marking. Alternating northbound lane closures between Hope Road and Coal Landing Road.

Route 3, Route 3 Business (Kings Highway), and Blue and Gray Parkway

Tuesday – Thursday, 8 p.m.-6 a.m. Alternating lane closures for milling and paving at various locations on Route 3, Blue and Gray Parkway, and Route 3 Business (Kings Highway) in the Ferry Farm area.

Route 3 Westbound (Kings Highway)

Tuesday – Thursday, 9 p.m.-5 a.m. Single lane closure for guardrail installation at the Route 3 westbound on-ramp.

Route 17

Tuesday – Friday, 9 a.m.-3 p.m. Single northbound and southbound lane closures on Route 17 for road median work under permit between Poplar Road and the Cardinal Forest Drive.

Route 627 (Mountain View Road)

Monday – Tuesday, 9 a.m.-3 p.m. Single lane closure with one-way, alternating traffic between Poplar Road and Kellogg Mill Road. Pavement marking.

Route 630 (Courthouse Road)

Tuesday – Thursday, 7 p.m.-6 a.m. Pavement marking. Alternating lane closures directed by a flagging crew between Route 648 (Shelton Shop Road) and Route 628 (Winding Creek Road).

Route 641 (Onville Road)

Tuesday – Friday, 9 a.m.-3:30 p.m. Single lane closure for guardrail installation near Route 610 (Garrisonville Road).

Route 8900 (Centreport Parkway)

Tuesday – Friday, 9 a.m.-3:30 p.m. Guardrail installation near the I-95 northbound on- and off-ramps.

Tuesday – Thursday, 9 p.m.-6 a.m. Guardrail installation near the intersection with Route 1, and near the intersection with Mountain View Road.

Bridge Cleaning

Tuesday – Saturday, 7 p.m.-7 a.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:

Route 1 over Austin Run
Route 1 over Accakeek Creek
Route 1 over Aquia Creek
Route 3 over Rappahannock River
Route 3 over eastbound Route 3 ramp
Route 17 over Deep Run
Route 608 over Potomac Creek
Route 610 over I-95
Route 610 over Aquia Creek
Route 626 over Potomac Creek
Route 627 over Potomac Creek
Route 651 over Potomac Run
Route 684 over Rocky Run
Route 753 over I-95
Route 1001 over Falls Run
Route 2150 over Falls Run
Route 8900 over Route 1
Route 8900 over I-95

Westmoreland County

Route 3

Tuesday – Friday, 9 a.m.-3:30 p.m. Guardrail installation. Flagging crew will direct one-way, alternating traffic near Route 659 (Kenwood Road).

Route 606 (Tucker Hill Road)

Tuesday – Friday, 9 a.m.-3:30 p.m. Guardrail installation. Flagging crew will direct one-way, alternating traffic near Old Yecomico Road.

Additional Projects in Fredericksburg District 

Gloucester County

Intersection Improvements at Route 17 and Fox First Street

Intersection Improvements at Route 17 and The Shoppes of Gloucester

Construction began in Aug. 2026 to reconstruct the existing Restricted Crossing U-Turns (RCUT) to better align with Fox First Street and The Shoppes at Gloucester. The crossovers are being modified to reduce the risk of crashes. Left turns out from side streets will continue to be prohibited. Project completion expected in June 2027.

Gloucester County and Middlesex County

Route 17 Northbound Bridge Replacement at Dragon Run

Bridge replacement is underway at the Route 17 northbound bridge over Dragon Run at the Gloucester County and Middlesex County line. The new bridge will be wider, taller, and longer than the existing bridge, which was built in 1931. Route 17 northbound will remain reduced to a single lane at the bridge while crews construct crossovers for a traffic diversion to the Route 17 southbound bridge planned for summer 2026. Work zone barriers will continue to separate the left and right lanes of Route 17 northbound. The right lane closed in Dec. 2025 after a vehicle crash damaged the bridge rail and guardrail. Project completion expected in Dec. 2027.

Lancaster County

Route 695 (Windmill Point Road) Bridge Replacement over Oyster Creek

Construction began in Aug. 2026 to replace a bridge on Route 695 (Windmill Point Road) over Oyster Creek. The new bridge will continue to have two travel lanes, but each lane will be 11 feet wide, with 4-foot-wide shoulders on each side. The bridge rail will be 42 inches high. During fall 2026, Windmill Point Road traffic will begin to cross a temporary bridge for the remainder of the project. A temporary traffic signal will control one-way, alternating traffic through the work zone. Vehicles of all legal weights, up to 45 tons, can cross the temporary bridge during construction. The vehicle width restriction on the temporary bridge will be 13 feet, 7 inches. Once the temporary bridge is installed and open to traffic, the posted speed limit will be 25 mph in the work zone. Project completion expected in May 2027.

Route 790 (Kamps Mill Road)

Route 790 (Kamps Mill Road) over Camps Millpond in Lancaster County has closed for motorist safety after a routine inspection of a culvert found deterioration. Motorists should use Route 3 as the recommended detour. VDOT will announce an estimated timeline to reopen the road to traffic once the emergency repair project schedule is finalized.

Northumberland County and Westmoreland County

Route 617 (Gardy's Mill Road)

Gardy's Mill Road is closed at Gardy's Millpond at the Northumberland and Westmoreland line with no reopening date. Gardy's Mill Road closed to through traffic for public safety in May 2025 due to a dam breach at the millpond. Water also damaged the road's travel surface. The Virginia Department of Transportation (VDOT) maintains the road, which runs on top of the dam maintained by the Virginia Department of Wildlife Resources (DWR). Travelers should use Route 202 (Hampton Hall Road) as a detour.

Richmond County

Route 360 at Route 624 (Newland Road) intersection improvements

Construction began in April 2026 on a $2.8 million project at the Route 360 and Newland Road intersection. The project is making several improvements to reduce the risk that vehicle paths will overlap at the intersection, resulting in a crash. The project is scheduled to be finished in Sept. 2026.

Spotsylvania County

I-95 Exit 126 Area Improvements

Route 1 is being widened to six lanes near the I-95 exit 126 interchange. This will provide space to build a second left turn lane for Route 1 traffic entering I-95 northbound and southbound. An auxiliary lane will be built on I-95 northbound from the on-ramp to the Route 208 (Courthouse Road) overpass to help entering vehicles merge with interstate traffic. The I-95 northbound and southbound on-ramps will be widened to receive traffic from dual left turn lanes. Two noise barriers will be built along I-95 southbound. Project completion is expected in Sept. 2027.

Route 620 (Harrison Road) Reconstruction and Widening

Harrison Road is being widened to four lanes between Gordon Road and Old Plank Road. The project will build a center turn lane along Harrison Road and additional through travel lanes at the Old Plank Road and Gordon Road intersections, and extend the current turn lanes at these intersections. Sidewalks will be built along Harrison Road, and pedestrian crossing signal equipment and crosswalks will be added at the Old Plank Road and Gordon Road intersections. Project completion expected in Sept. 2026.

Stafford County

Route 1 Bridge Replacement at Chopawamsic Creek

Construction is underway on a $13.9 million project to replace the four-lane Route 1 bridge over Chopawamsic Creek. The bridge is located just south of the Prince William County line and is near Quantico Marine Corps Base. Four travel lanes will remain open at most times during construction, with periodic lane closures needed during off-peak times as traffic is shifted to complete the bridge construction in phases. Construction is expected to be complete in June 2028.

Route 1 at Telegraph Road and Woodstock Lane 

Construction is underway to realign the intersection of Route 1 and Telegraph Road, and to widen Route 1 at Woodstock Lane to build a southbound left turn lane and to make access management improvements. New traffic signal equipment will be installed at Telegraph Road and dual left turn lanes will be built from Telegraph Road onto Route 1 southbound. A left turn lane is being built from Route 1 southbound into Woodstock Lane. At Woodstock Lane, a concrete median will be installed on Route 1 to restrict turning movements. Stafford County is locally administering this project. Project completion in fall 2026. Visit the county project page

Route 1 and Courthouse Road Intersection Improvement Project

Construction is underway to widen Route 1 and provide improvements at the intersection of Route 1 and Courthouse Road, and at the intersection of Route 1 and Bells Hill Road/Hope Road. Route 1 will be improved to have four lanes with a concrete median separating northbound and southbound traffic, with dedicated left turn lanes onto Courthouse Road, Bells Hill Road and Hope Road. Improvements will also be made on eastbound and westbound Courthouse Road approaching Route 1. An 8-foot-wide sidewalk will be installed along Route 1, with crosswalks. Stafford County is locally administering this project. Project completion expected in summer 2027. Visit the county project page

Route 644 (Rock Hill Church Road) Bridge Replacement

Route 644 (Rock Hill Church Road) is closed to replace the temporary single-lane structure over Aquia Creek with a two-lane bridge. Rock Hill Church Road will remain closed to through traffic between Dunbar Drive and Van Horn Lane with a detour in place until June 2027.

Commuting and Ridesharing Information

GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area and is part of the George Washington Regional Commission.

Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665. 

(END)

 

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

Guinea Free Press

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.